2-6 CP2000 Setup Guide
020-100070-01 Rev. 1 (10/08)
Section 2: Installation and Setup
6. Power Cables to Head: From behind the main AC breaker panel (within the pedestal), connect
both identical power cables 34-001992 to the IEC receptacles located near Panel B (100-230 VAC)
and Panel C (200-230 VAC). These cables are interchangeable - connect either cable to either
receptacle and secure with metal strain-relief clip provided (Figure 2-7).
FIGURE 2-7 CONNECT “PROJECTOR” BREAKER POWER CABLES TO PROJECTION HEAD
IMPORTANT! Components in the lamp compartment will require 200-230 VAC.
NOTE: If you prefer to use an uninterrupted power supply (UPS) for supplying power to the
projection head, route the UPS power cables through the pedestal toe and connect to the IEC
receptacles on Panel B (100-230 VAC). In this case, only one power cable provided in the pedestal is
used.
7.
Check Ethernet and TPC Power: Within the pedestal, confirm that the power supplies for the
Ethernet hub and TPC both connect to a power bar wired to the terminal block TB2 from either the
facility power source or the existing projector wiring (Figure 2-8). No other components or
external equipment should be connected here.
NOTE:
This is a current-limited 120 VAC outlet powered by the ballast and separately fused.
FIGURE 2-8 CHECK TPC AND ETHERNET HUB CONNECTIONS TO HUB
Page view 17