Christie CP2000-M User Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 205
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
Section 2: Installation & Setup
CP2000-SB User Manual 2-5
020-100162-04 Rev. 1 (05-2009)
STEP 5 - Connect Pre-Installed Cabling (Pedestal-to-Head)
Numerous cables are pre-installed within the pedestal and must be routed up to the underside of the projec-
tion head, where they connect to one of three panels (or two IEC power sockets). Connect pedestal-to-head
cabling as follows:
NOTE: For all cable connections, keep cable ties that have been trimmed at manufacture, but remove
temporary ties that are untrimmed and have tails.
a. Open both pedestal doors (Figure 2-5).
b. Open the rear side door on the operators side.
c.
SET BALLAST AC INPUT SWITCH:
Before connecting the ballast to AC, set the
ballast’s AC input switch to match the AC
available at the site. Toggle left for nominal
200 VAC supplies and toggle right for 400
VAC supplies. The factory default is 200 VAC.
d.
BALLAST RS-232 CABLE:
Connect the ballast’s RS-232 cable 34-002075
to Panel B (9-pin), routing through the small
rectangular access hole in the front underside
of the projection head (Figure 2-6).
e.
BALLAST INTERLOCK CABLE:
Connect the ballast’s interlock cable 34-002007 to Panel C (9-pin), routing through the small rectangu-
lar access hole in the rear underside of the projection head (Figure 2-6). Ensure a second connector
from Panel C to Panel B is connected (P/N 001-100376-01). The remaining third connector is a non-
functional spare.
Figure 2-5 Open Projector for Access
Figure 2-6 Connect Ballast RS-232 and
Interlocks to Projection Head
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 204 205

Comments to this Manuals

No comments